RegiaPro Less paperwork, more craft

Health and safety consultant software and CRM

RegiaPro is software for health and safety coordinators running several sites at once: the CRM keeps track of the clients, contractors and designers who put work your way, and the management side keeps your quotes, appointments, reports, payments and invoices. In the steps below, this trade is already set up.

Built for more than 50 trades: this one is already set up for yours

Yellow helmet hanging on a post on a site with a crane

Engagement accepted

documents and deadlines in one record

Today in RegiaPro

Example with made-up data

  • 9

    Active engagements

    +2 this month

  • 4

    Deadlines

    this week

  • €5,800

    To be collected

    3 fee notes open

  • Engagement accepted by the client

    8 min ago

  • Fee note sent

    yesterday

  • Case deadline on Friday

    yesterday

  • Free for 14 days, no card needed
  • Works in the browser, on your phone too
  • Calendar synced with Google and iCloud
  • WhatsApp messages already written
  • Invoices from your Fatture in Cloud, from the Pro plan
  • Public prices, the same for everyone

    What do you need? The basics for Health and safety consultant software and CRM are switched on. Switch on what you really need: we’ll pick the plan from here.

    Step 3 of 4
    Software and CRM for design-stage and construction-stage safety coordinators

    A safety coordinator lives between plans due before work starts, site visits you can’t miss and clients who pay when the site closes. You draft the safety plan and the health and safety file with your own tools; RegiaPro, software for health and safety coordinators, keeps the appointments, proposals, signed documents and payments of every site in order, from any browser, on site too. Pricing starts at €19.90 a month.

    Stacked site helmets, with the city in the background

    What you’ll find inside RegiaPro: from enquiry to invoice

    One program for clients, proposals, engagements and invoices. Tap a card to see how it works.

    • One record per client

      Calls, quotes, contracts and payments in date order: when they call back six months later, you know at once where you left off.

      The Lead module
    • Who to call back today

      Every morning, the list of people to get back to, with the WhatsApp message already written. It goes from your own number, when you decide.

      Follow-ups and messages
    • Quotes from your own template

      The PDF with your logo, sent as a link: you know when it was opened. If there is no reply, the program brings it back to you after 3, 7, 14 and 30 days.

      The quote
    • The contract without retyping

      It comes from the accepted quote, with the details already in, and comes out as a PDF ready to sign. From the Pro plan.

      Which plans include it
    • The site visit

      It is a stage of the job, with its own date; the travel cost is worked out on the real route.

      The costs of each job
    • Consulting on a retainer

      The draft invoice for each period gets ready on its own. From the Pro plan.

      Fees and renewals
    • Deposit, balance and invoice

      Deposit and balance are recorded separately, each with its own date. The invoice comes out of the record with numbering that carries on by itself: from the Pro plan, with the XML file from the Studio plan.

      The plans compared
    • The calendar you already have

      Appointments and jobs in your phone’s calendar: RegiaPro connects to Google Calendar and iCloud.

      The connected calendar
    • What is really left

      A job’s costs come off that job, the business costs off the year: in December you know what is left, not just what came in.

      The figures of each job
    • From your phone, on site

      It works in your phone’s browser: open the client’s record and attach photos and documents, up to 15 MB each.

      How it works

    RegiaPro up close: the real screens

    This is what the program looks like inside. Sample data: the clients, the jobs and the amounts are made up.

    The day: The home page: today’s job with the time to leave, and who needs a call back.
    The day. The home page: today’s job with the time to leave, and who needs a call back.

    Health and safety coordinator software: design and construction coordinators running several sites

    RegiaPro is built for the surveyor, engineer or architect who works as a self-employed coordinator with three, five or ten sites of different sizes on the go. These are the situations where one record per appointment pays off most.

    Design-stage coordination

    The client appoints you when the design is commissioned: safety and coordination plan, health and safety file, estimate of safety costs. The work is concentrated into a few weeks with a clear deadline, the tender or the award to the contractor.

    Construction-stage coordination

    From the start of work to completion: checking the contractors’ method statements, meetings, regular site visits, reports, updating the plan. It is the longest appointment and the one where the paperwork multiplies.

    Private renovations and blocks of flats

    The detached house with three contractors taking turns, the refurbished façade of a block of flats: clients who don’t know the rules and need someone to explain them patiently.

    Takeovers and urgent appointments

    The previous coordinator leaves after work has started, the contractor finds out it has to bring in a subcontractor: appointments that arrive with the site already open and little time to get organised.

    Where coordinators lose time

    You know the construction safety regulations inside out. What gets complicated is the part no course teaches: who proposed the site to you, what fee you wrote down, whether the client has signed the appointment, which site still has to pay. RegiaPro’s CRM tracks the people and the follow-ups; the management side keeps quotes, appointments, documents and payments.

    Day one: the coordinator’s open sites

    Start by adding your open sites: one record per appointment, with the start or completion date, the agreed fee and the appointments already signed. From there the calendar shows the confirmed dates and every record tells you how much is still to be paid.

    The list of jobs in RegiaPro, month by month, with the status and amount of each
    A real screen from the program. Made-up names and amounts.

    CRM for health and safety consultants: clients, contractors and designers

    A coordinator gets appointments through different routes: the designer who recommends you to the client, the contractor who suggests you, the property manager, the client from a previous site. Here are six situations where an appointment is usually lost, and what you find in RegiaPro instead.

    The designer recommends you to the client

    They send you the client’s name and number in a quick message, and a week later you can’t remember which site it belongs to.

    In RegiaPro a record is created with the source “Collaborator” and the designer’s name in the notes.

    The client compares three quotes

    They’ve asked others for a coordination price too and put off the decision until the contractor pushes.

    In RegiaPro you’re reminded about the undecided client three days after the quote, and if they’re still silent, at seven, fourteen and thirty days.

    The site documents are everywhere

    Prior notification, contractors’ method statements, signed reports, site visit photos.

    In RegiaPro they’re attached to the site record as PDF, Word or image files, up to 15 MB each.

    The start of work is getting close

    Without the plan delivered and the appointments signed the contractor shouldn’t go on site, but the scaffolding is already booked.

    In RegiaPro the confirmed start date is on your phone’s calendar, and the important note reminds you seven days before that date.

    The same client, two stages

    First the plan at design stage, then coordination during the works, perhaps with different timings and payments.

    In RegiaPro you open one record per stage, and the details of who pays, entered once, apply to both.

    Distant site visits eat into your earnings

    Forty kilometres for every visit, a colleague covering for you during a week’s holiday.

    In RegiaPro travel, collaborator and extra costs sit on the record, and the Report deducts them from your takings in the margin.

    The RegiaPro home page on a phone: today’s job and who to call back
    On the phone: the home page. Made-up names.

    Construction-stage safety coordinator: a site step by step in the software

    Below is a coordination appointment handled in RegiaPro from the first phone call to the final report. The client, designers, dates and figures are made up: they show how the software is used and are not meant to suggest a fee.

    The case: an extension with three contractors

    On 10 February the architect Paolo writes to you: his client Roberta is extending her house with a new ground-floor wing. A building contractor, a plumbing and electrical installer and a roofer will be working there, with a planned start on 4 May and completion on 31 August. A coordinator is needed for both the design and construction stages.

    1. Two records, one per stage

      You open the “safety plan” record for Roberta with phone, email, the source “Collaborator” and the site’s town. In the “Who the documents are made out to” box you enter Roberta’s tax code and address, as she is the one paying. In the notes you write the street, type of work, expected contractors and the architect’s name. Once the record is saved, you attach the design drawings and the schedule Paolo forwarded to you. You’ll open the construction-stage coordination record later, already linked to the same details.

      Try it for 14 days
    2. The safety plan quote, with the services in the note

      On 13 February you put the fee, €1,400, on the record and prepare the quote: a PDF with your practice’s logo, Roberta’s details and your template text, with the number of days it’s valid for. The amount goes on one line; in the note printed at the bottom you list the services: safety and coordination plan, estimate of safety costs, health and safety file, draft prior notification. You email it from the record; the status changes to “Quote sent” and the log records the send.

      The quote from your template
    3. The proposal including the construction stage

      On 18 February Roberta asks for a price that also covers site visits during the works. You prepare a second quote from the same record, with the amount raised to €4,000 and the weekly visits, contractor meetings and reports in the note: it gets number 18/2026-P, and 17/2026-P stays as it was. Without a reply, from 21 February Roberta would have appeared among the clients to follow up.

      The quote from your template
    4. Roberta signs the engagement letter and appointments

      On 25 February Roberta accepts the full proposal. You bring the first record back to €1,400 for the plan and open the second, “construction-stage coordination”, at €2,600, so each stage has its own payment. On the Pro plan you generate the engagement letter from the first record; in your template it’s called “Health and safety coordinator appointment” and already contains the clauses you work with. RegiaPro fills in the client’s name and tax code, the date, fee and number, and takes the two stages entrusted to you from the notes. Roberta signs it together with the two appointments.

      The contract, from the Pro plan
    5. The plan delivered and the date on the calendar

      You confirm the first record by setting 10 April, the delivery date for the plan and the health and safety file, so it appears among the Google or iCloud events on your phone. As the important note you leave “ask Paolo for the final contractors’ names for the notification”: the reminder falls due on 3 April. On 10 April you attach the signed plan, Roberta pays the €1,400 by bank transfer, and you note the date and method, and the Pro plan produces the invoice for the design stage.

      The connected calendar
    6. The site in the second record

      The construction-stage coordination record has the date of 4 May and the site’s town, from which you calculate the travel. In the important note you write “check the method statements of all three contractors before they go on site”: it reminds you on 27 April. Between May and August you attach the kick-off meeting report, the site visit reports and the photos; when a colleague covers for you for a week, you record them as a collaborator, €150.

      Try it for 14 days
    7. Final report, balance and the construction-stage invoice

      On 31 August you close with the final report and attach the updated health and safety file. Among the extra costs on the second record you enter €35 for the bound copies delivered to the client. On 5 September Roberta pays the €2,600: you record the bank transfer and prepare the invoice for the second record, with the details already filled in and the next number for the year.

      Invoices and payments in the plans

    The numbers on Roberta’s site

    Plan and health and safety file €1,400, construction stage €2,600: €4,000 received. Less €150 for your colleague and €35 for copies, that leaves €3,815, before travel, tax and the hours spent on site. The two records hold two quotes, the engagement letter, the appointments, the plan, the reports, the photos and two invoices; in the Report those payments go on the line for work that came from collaborators.

    Roberta’s site in a table (example with made-up data)

    DateWhat happensWhat you do in RegiaPro
    10 FebruaryThe architect refers the sitePlan record, source “Collaborator”, drawings attached
    13 FebruarySafety plan proposal, €1,400Quote 17/2026-P with the services in the note, status “Quote sent”
    18 FebruaryRequest including the construction stageQuote 18/2026-P for €4,000, 17/2026-P kept
    25 FebruaryAccepts and signs the appointmentsEngagement letter as a PDF, second record at €2,600 for the construction stage
    3 - 10 AprilFinal contractors and plan deliveryReminder, plan attached, bank transfer and invoice for the first record
    4 May - 31 AugustSite visits, meetings and reportsSecond record with travel, reports, photos and stand-in colleague
    5 SeptemberCoordination balanceBank transfer recorded and invoice for the second record

    Prior notification, reports and health and safety file: the documents for every site

    A well-run site produces a pile of paperwork that someone, one day, will ask to see. In RegiaPro every document stays on the record of the site it belongs to, and the log keeps the date you sent it.

    The prior notification

    When more than one contractor works on site, the notification must be sent before work starts, and a copy stays on display. The draft you prepare and the submission receipt are attached to the record, so you have them at the first inspection.

    The contractors’ method statements

    Each contractor delivers its own method statement and the coordinator checks it is suitable. You attach the statements received and your comments, and in the record’s notes you keep the list of contractors and their contacts.

    Site visit and meeting reports

    The site visit report, with instructions and photos, and the coordination meeting report with signatures: scanned or exported to PDF, they stay in order on the record. When you forward them to the client from the software’s email, attaching the file, that step goes into the log too.

    The health and safety file

    You prepare it at design stage and update it at the end of the works: both versions sit on the record, ready to hand to the client together with the final report.

    The WhatsApp message to the client

    Among your WhatsApp texts you save, once, the reminder for the client: let you know about every new contractor or subcontractor before they go on site, with the site’s town filled in by the placeholder. You open it from the record, already complete, and it goes from your number.

    Safety and coordination plan: the design-stage coordinator’s quote and fee

    A coordinator’s fee depends on the value of the works, how long the site runs and the number of visits. The person asking wants to understand quickly what they’re paying for; the person writing it wants a proposal that holds up when the site overruns. In RegiaPro the quote starts from the client’s record.

    Visits and meetings in the quote note

    Plan, estimate of safety costs, health and safety file, planned visits and how often, meetings, reports: the note is printed under the amount and the client reads everything before signing.

    Fee and insurance in writing

    The fee must be given to the client in writing, together with the complexity of the appointment and your professional indemnity insurance details. The numbered, dated quote is proof of what you proposed.

    When coordination overruns

    If the works run two months longer, you update the amount on the construction-stage record and prepare a new quote with the extra visits in the note. The quote signed at the start is not changed and keeps its number.

    Sites that still owe you for coordination

    Deposit and balance instalments are recorded on the record with date and method. The home page shows the outstanding balances of all your sites, so you know which client still has to pay.

    The coordination invoice

    On the Pro plan the invoice is generated from the site record, made out to the client and numbered in sequence; for coordinators on Italy’s flat-rate scheme RegiaPro adds the exemption wording and the stamp duty. The Studio plan also produces the file to send to the SdI (Italy’s e-invoicing system) and, once the year is closed, an archive of all your invoices.

    Costs page of RegiaPro’s health and safety consultant software: the year’s expenses broken down by category

    RegiaPro’s overheads page, captured with demo figures. When you work by project you’ll find items such as “Car and site visits” or “Technical equipment and software”; the mileage for a specific site is instead calculated on its record.

    Want to see it with your own work?

    Fourteen days with the Full plan features, no card needed. Then you decide.

    Free photos from Pexels and real screenshots of the software, with made-up data.

    Appointing the safety coordinator: the engagement letter to sign

    The client makes the appointment, but it’s worth putting in writing beforehand what you do and what it costs. In RegiaPro, from the Pro plan, you prepare the document from the record: the wording is yours, the details fill themselves in.

    Design, construction or both

    Design, construction or both, with what each includes. You write the services for each site in the record’s notes and the placeholder carries them into the document.

    Visits and meetings included

    How many visits, how often, how many coordination meetings, and how extra ones are agreed. It’s the clause you need when the site runs longer than planned.

    Coordination fee and payments

    Total fee, advance and balance are taken from the record, together with the client’s personal and tax details: what gets signed matches what will be paid.

    The client’s commitments to the coordinator

    Telling you about contractors and subcontractors before they go on site, sending the notification, guaranteeing you access. Written once in the template, they apply to every appointment.

    Engagement letter signed together with the appointments

    The client signs it on paper at the same time as the appointments; the signed copy is uploaded to the site record.

    Software for health and safety coordinators: plan writing, document control or CRM?

    Anyone looking for health and safety coordinator software finds almost nothing but programs for writing plans. On 14 September 2026 we ran two searches and read three pages in depth: two programs for drafting plans, reports and deadlines, and a guide to choosing site management software. We found no prices, and CRM didn’t appear in the titles.

    Program for drafting safety plans and method statementsDocument control platformRegiaPro, business software and CRM
    Who it's forCoordinators and contractors who write plans and reportsContractors, main contractors, large sitesSelf-employed coordinators with private clients and small contractors
    What it handlesPlans, safety costs, reports, health and safety file, deadlinesContractors’ documents, deadlines, site accessClients, sources, quotes, appointments, attached documents, payments, invoices
    PriceNot stated on the pages we readNot stated on the page we readFrom €19.90 a month, published
    How to try itDemo with a sales repDemo with a sales rep14 days with the Full plan switched on

    Right for coordinators who

    • coordinate sites for private clients, blocks of flats and small contractors, even many at once;
    • need to know which client is waiting for a proposal, what’s signed and who has to pay;
    • would rather read a price than book a demo.

    What a construction-stage coordinator finds on signing in

    • a record for each site or each stage, with client, source, notes, attachments and log;
    • numbered quotes as PDFs and, from Pro upwards, engagement letters to sign and invoices;
    • confirmed dates on your phone’s calendar, calculated travel and the Report by source.

    How to start: three steps, no card needed

    You sign up, try it on your real work, and only decide at the end.

    1. Sign up in a minute

      Your name, your business name and your email. We don’t ask for a credit card: access starts when you confirm your email.

      Start the trial
    2. Set it up for your trade

      Menus, record fields and job stages speak your language. You connect the calendar you already use.

      Choose your trade here
    3. Try everything, then choose

      Fourteen days with the Full features. At the end you choose a plan, or you stop: nothing renews on its own.

      See the plans

    How much RegiaPro’s health and safety consultant software costs

    Prices are public. A health and safety coordinator needs one of three plans, plus the free trial.

    Start for the self-employed coordinator: €19.90 a month

    Paying yearly, €199. Unlimited records, follow-ups on quotes left pending, WhatsApp texts and 10 quotes a month. Engagement letters and invoices come with Pro.

    Pro for sites all year round: €34.90 a month

    Paying yearly, €349. Adds the engagement letter as a PDF with the client’s details and numbered invoices, including on the flat-rate scheme. It’s the plan for anyone with sites open all year round.

    Studio with XML for coordinators: €59.90 a month

    Paying yearly, €599. On top you get the XML for Italian e-invoicing and the annual invoice package to pass on to your accountant.

    Fourteen days on your next site

    All of Full, without asking for your credit card. The trial opens by itself as soon as you confirm your email, and then you choose which plan to keep.

    Full, €44.90 a month, is designed for those who deliver video and photo shoots to their clients. Every plan is compared with the others on the pricing page.

    Why you can trust it: your data stays yours

    What matters before you put your clients into a new program.

    • Your data stays in Europe

      On servers in Europe. Each business sees only its own data: the database itself enforces the separation.

    • If you stop, your data stays yours

      The account goes read-only and nothing is deleted unless you ask. We send you a copy in a readable format.

    • Prices written up front

      A public price list, the same for every trade: you can read it on the pricing page before you sign up.

    • You talk to a person

      Born in a studio in Tuscany, not in an office. Write to info@regiapro.it or use the contact page.

    FAQ from self-employed design and construction coordinators

    Is it better to have one record for each site or one for each stage?

    If design and construction have different payments, open one record per stage, linked to the same details of who pays: each has its own quote, date, payment and invoice. Search for the client’s name and you’ll find both, even after archiving.

    Can I attach reports, notifications and contractors’ method statements?

    Yes. On a saved record you can attach PDF, Word, JPG or PNG files up to 15 MB each: signed reports, prior notification receipt, method statements, site visit photos, health and safety file. You can also send them to the client from RegiaPro in an email with the document attached: the send appears in the log.

    How do I write the included visits into the quote?

    The fee goes on the record, and visits, frequency, meetings and reports go in the quote note, printed in the PDF under the amount. When the site runs longer, you generate an updated quote with a new number, leaving the signed one untouched.

    How do I prepare the engagement letter?

    From the Pro plan you write the template once, with the title and terms you use. For each client the name, tax code, date, fee, deposit, balance and document number come from the record, and the stages entrusted to you come from the notes; you print the PDF to be signed.

    How do I work out the cost of site visits?

    Enter the site’s town on the record and RegiaPro calculates the travel with kilometres, fuel, tolls and time. The Report adds up travel, collaborators and extra costs and deducts them from your takings, so you see your margin by month and by source.

    How do I record who proposed the appointment to me?

    Choose the source on the record: you edit the list in “Settings”, for example with “Designers”, “Contractors” and “Property managers”. The Report shows you which of these channels bring the appointments that actually get paid.

    How do I start with the sites I’m already running?

    Create a record for each open site, with the completion date, the fee, the payments received and the signed appointments. You add the other clients when they propose a new appointment.

    Can I open it from my phone on site?

    Yes, RegiaPro works in the browser on your phone too. During the visit you open the record, reread the list of contractors in the notes and attach the photos and the signed report straight away.

    Updated on 14 September 2026. The features we describe have been checked on RegiaPro; Roberta, the architect Paolo and the site figures don’t exist, and the comparison comes from public pages read on the same day. Found a description that doesn’t match RegiaPro? Drop a line to info@regiapro.it and the page will be reviewed.

    Try RegiaPro on your next site to coordinate

    When the next coordination request comes in, open the record in RegiaPro and follow it from the quote to the final report: within two weeks you’ll know whether it makes your work simpler. For 14 days you get the full Full plan, then you choose.